Home
Up

Previous page 3 of 4 Next

0181 - More gas line trenching 0182 - Stained trim 0183 - Here comes the propane tank 0184 - Setting the tank 0185 - Mark installing main electric
0181 - More gas line trenching.jpg 0182 - Stained trim.jpg 0183 - Here comes the propane tank.jpg 0184 - Setting the tank.jpg 0185 - Mark installing main electric.jpg
0186 - Dan the bossman is watching 0187 - Jim installing the security system 0188 - Who made this mess 0189 - Tiling master tub 0190 - Grouting the fireplace
0186 - Dan the bossman is watching.jpg 0187 - Jim installing the security system.jpg 0188 - Who made this mess.jpg 0189 - Tiling master tub.jpg 0190 - Grouting the fireplace.jpg
0191 - Grouting master tub 0192 - Trimming the first closet 0193 - He bends conduit with his bare hands 0194 - Lower kitchen cabinet shells 0195 - Filling in the electrical trench
0191 - Grouting master tub.jpg 0192 - Trimming the first closet.jpg 0193 - He bends conduit with his bare hands.jpg 0194 - Lower kitchen cabinet shells.jpg 0195 - Filling in the electrical trench.jpg