Home
Up

Previous page 2 of 4 Next

0166 - Sidewalk supervisors 0167 - Moving topsoil for us to keep 0168 - First dirt load of 300 yards hauled away 0169 - The dirt pile's getting smaller 0170 - Leveling by side porch
0166 - Sidewalk supervisors.jpg 0167 - Moving topsoil for us to keep.jpg 0168 - First dirt load of 300 yards hauled away.jpg 0169 - The dirt pile's getting smaller.jpg 0170 - Leveling by side porch.jpg
0171 - Grading almost done 0172 - Getting more and more level 0173 - Base drop for gravel driveway 0174 - Watch out! 0175 - Last gravel dump in front of garage
0171 - Grading almost done.jpg 0172 - Getting more and more level.jpg 0173 - Base drop for gravel driveway.jpg 0174 - Watch out!.jpg 0175 - Last gravel dump in front of garage.jpg
0176 - Scott trenching for house powerline 0177 - Watch out for the garage power line 0178 - Close-up of Scott 0179 - Trenching to power connection 0180 - Propane gas line ditch
0176 - Scott trenching for house powerline.jpg 0177 - Watch out for the garage power line.jpg 0178 - Close-up of Scott.jpg 0179 - Trenching to power connection.jpg 0180 - Propane gas line ditch.jpg